LCRA Operations Report 2018 December 10 – plans are still in place to lower Lake LBJ Dec. 30 – Feb.23

 

Last Update: Dec 10 2018 7:58AM

The River Operations Report provides information about LCRA’s daily water supply operations. Subscribe to receive the River Operations Report by email.

LCRA will lower lakes LBJ and Marble Falls for about eight weeks in early 2019.  Read more.

LCRA’s operation of the Highland Lakes is governed by the 2015 Water Management Plan. Read more about LCRA’s operation of the Highland Lakes.

LCRA posts information about flood operations in the Flood Operations Report when conditions warrant.

Data presented on this web page includes provisional data obtained by LCRA for the use of its professional staff. This data is retrieved and displayed automatically, and is subject to revision.